
Blue Steel Storage Rack for Warehouse and Garage, 2000 mm High
from €74.46 per piece, net, at the factory MOQ
Storage rack in cold-rolled steel for warehouses, garages and stockrooms: perforated uprights, snap-in and screw assembly, anti-corrosion powder coating. Height 2000 mm, load capacity 200 or 300 kg per tier depending on the variant; number of tiers to order.
Sizes (L×D×H): 120×50, 120×60, 150×50, 150×60, 200×50 and 200×60 cm at 200 cm height. Price from the smallest variant, exact price per size and load on request. Manufacturer certificates: CE / ISO 9001; OEM available.
- MOQ 1 pcsminimum order (factory MOQ)
- Your logo possiblelogo, colours, packaging
- GPSR label & EU docswe act as EU importer
- 8–12 weeks to your doorrail/sea; air on request
Indicative “from” price per piece, excl. VAT, freight and duty. Your delivered price depends on quantity, branding and destination — written offer within 2 working days.
Specifications
| Type | storage rack, snap-in |
|---|---|
| Material | cold-rolled steel, powder coated |
| Sizes | 120×50 / 120×60 / 150×50 / 150×60 / 200×50 / 200×60 × 200 cm |
| Load capacity | 200 or 300 kg per tier (per supplier) |
| Tiers | to order |
| Manufacturer certificates | CE / ISO 9001 |
| Logo | logo application — on request |
| Package / weight | 200 × 70 × 70 cm / 99 kg |
Data from the manufacturer. Sizes, colours and materials can be adjusted for orders above the MOQ.
How to order this product
Ask for a price
Tell us the quantity, colours and destination country. Offer within 2 working days.
Get a sample
We send a sample to your address in 7–14 days. The cost is credited against the order.
Production and QC
The factory produces in 25–45 days; we inspect the goods before they leave the factory.
Delivery
Rail or sea to Poland in 25–45 days, customs cleared, then to your warehouse.
More Shelving & storage

5-Tier Boltless Steel Shelving, 90 × 30/40 × 180 cm, Powder-Coated
from €28.46 net

Medium-Duty Steel Storage Rack, 200 cm High, 120–180 cm Long
from €77.34 net

Steel Warehouse Rack 200 kg, 200 cm High, 150 or 200 cm Long
from €85.96 net

Plastic 5-Tier Shelving Unit for Garage and Storage, Modular
from €51.75 net

Stackable Open-Front PP Bins for Small Parts, Several Sizes
from €1.15 net

Light Galvanised Boltless Shelving, 5 Shelves, 175 kg per Shelf
from €25.85 net

Adjustable Steel Shelving 4 Tiers, 2000 mm High, 500 kg
from €140.88 net

Light-Duty Boltless Shelving 915 × 457 mm, 910–1830 mm High
from €166.75 net
Frequently asked questions
What is the minimum order for the Blue Steel Storage Rack for Warehouse and Garage, 2000 mm High?
The factory minimum is 1 pcs. For orders with your own logo or packaging the minimum is usually higher — we confirm it in the offer.
Can I get it with my own logo?
Most products can carry a logo on the product, the label or the packaging. We check the options with the factory and show you a mock-up before production.
Is it compliant for sale in the EU?
We import as an EU company, prepare GPSR labelling with the responsible person and product safety information, and order tests where the material requires it.
How long does delivery take?
Usually 8–12 weeks from order to your warehouse by rail or sea: 25–45 days production plus 25–45 days transport. Air freight takes 7–12 days after production.
Request a price for this product
Quantity, colours and delivery country are enough for a first offer. Add your logo if you want it branded.
- Reply on working days, usually within a few hours
- Prices delivered to your door, customs and VAT included in the calculation
- Written offer within 2 working days